2018 Construction Monitoring

Environmental monitoring for the 2018 construction includes water and air monitoring. Air monitoring is being performed around the secure landfill, and water and air monitoring are being performed for the staging area during the in-river shoreline work. These monitoring activities and results are summarized below.

 

Air Monitoring - 2018 Secure Landfill Construction and Operation

Program includes particulate monitoring using real-time meters for particulates (or dust) and volatile organic compounds (VOCs) and sampling for PCB analytical testing. Corrective action levels have been established based on levels that are safe for the community for particulates, VOCs, and PCBs. The actual monitoring results are compared to the corrective action levels to determine if adjustments in construction are needed. The air monitoring locations and tabulated results are provided below.

Air Monitoring Locations

Site Map
 

2018 Air Particulate Data
(Corrective Action Level = 0.150 milligrams per cubic meter above upwind location)

View Recent Data

  Monitoring Station ID (see figure)  
Date Action Level Check SLF-AIR1 SLF-AIR2 SLF-AIR3 SLF-AIR4 SLF-AIR-PA SLF-AIR-PB Notes
Jul 1 All Below 0.043 0.0423 0.0455 0.0329 NA NA --
Jul 2 All Below 0.0663 0.0621 0.0893 0.0383 NA NA --
Jul 3 All Below 0.0506 0.045 0.0474 0.0372 NA NA --
Jul 4 All Below 0.0319 0.0204 0.049 0.0176 NA NA --
Jul 5 All Below 0.0363 0.0245 0.0556 0.0475 NA NA --
Jul 6 All Below 0.0306 0.0275 0.0297 0.0253 NA NA --
Jul 7 All Below 0.0122 0.0086 0.0108 0.0077 NA NA --

NA = Data not collected
Particulates (milligrams per cubic meter)
Return to top


2018 Air Volatile Organic Compound Data
(Corrective Action Level = 25 ppm above upwind location)

View Recent Data

  Monitoring Station ID (see figure)  
Date Action Level Check SLF-AIR1 SLF-AIR2 SLF-AIR3 SLF-AIR4 SLF-AIR-PA SLF-AIR-PB Notes
Jul 1 All Below 0.0269 0.0423 0.0482 0.0256 NA NA --
Jul 2 All Below 0.196 0.073 0.1909 0.0678 NA NA --
Jul 3 All Below 0.0721 0.0654 0.1066 0.0855 NA NA --
Jul 4 All Below 0.1252 0.0325 0.0963 0.0743 NA NA --
Jul 5 All Below 0.1207 0.1317 0.1333 0.0792 NA NA --
Jul 6 All Below 0.1538 0.0956 0.061 0.0611 NA NA --
Jul 7 All Below 0.3673 0.0373 0.0528 0.0679 NA NA --

NA = Data not collected
Volatile Organic Compounds (VOCs parts per million)
Return to top


2018 Air PCB Data
Corrective Action Level = 0.100 micrograms per cubic meter

View Recent Data

  Monitoring Station ID (see figure)  
Date Action Level Check SLF-AIR1 SLF-AIR2 SLF-AIR3 SLF-AIR4 SLF-AIR-PB Notes
July 2018 NA NA NA NA NA NA --

NA = Analysis not required
Total PCBs (micrograms per cubic meter)
Return to top

 

Air Monitoring - 2018 Route 131 Staging Area Construction

Program includes particulate monitoring using real-time meters for particulates (or dust) and volatile organic compounds (VOCs) and sampling for PCB analytical testing. Corrective action levels have been established based on levels that are safe for the community for particulates, VOCs, and PCBs. The actual monitoring results are compared to the corrective action levels to determine if adjustments in construction are needed. The air monitoring locations and tabulated results are provided below.

Air Monitoring Locations

Site Map
 


2018 Air Particulate Data
Corrective Action Level = 0.150 milligrams per cubic meter above upwind location

View Recent Data

  Monitoring Station ID (see figure)  
Date Action Level Check SA-AIR1 SA-AIR2 SA-AIR3 SA-AIR4 Notes
Jul 3 All Below 0.0742 0.054 0.0757 0.1513 --
Jul 4 All Below 0.0369 0.1134 0.0363 0.0261 --
Jul 6 All Below 0.0411 0.0415 0.0508 0.0281 --
Jul 7 All Below 0.0145 0.0139 0.0146 0.012 --
Jul 10 All Below 0.0143 0.0167 0.023 0.0136 --
Jul 11 All Below 0.0557 0.0415 0.0464 0.0357 --
Jul 12 All Below 0.0279 0.0302 0.0265 0.0195 --
Jul 13 All Below 0.0263 0.0365 0.0247 0.015 --
Jul 14 All Below 0.0517 0.0389 0.0361 0.0193 --
Jul 17 All Below 0.0515 0.0383 0.0444 0.0355 --
Jul 18 All Below 0.032 0.0299 0.027 0.0168 --
Jul 19 All Below 0.0074 0.0066 0.008 0.0061 --
Jul 20 All Below 0.0153 0.0123 0.01 0.0085 --
Jul 21 All Below 0.01 0.0089 0.0097 0.0065 --
Jul 24 All Below 0.0176 0.0283 0.0104 0.0121 --
Jul 25 All Below 0.0122 0.0125 0.0084 0.0091 --
Jul 26 All Below 0.0577 0.0539 0.0613 0.0485 --
Jul 27 All Below 0.0571 0.0542 0.0609 0.0451 --
Jul 28 All Below 0.0171 0.0151 0.0267 0.0131 --
Jul 31 All Below 0.0305 0.0319 0.0329 0.0277 --

NA = Data not collected or recorded
Particulates (milligrams per cubic meter)
Return to top


2018 Air Volatile Organic Compound Data
(Corrective Action Level = 25 ppm above upwind location)

View Recent Data

  Monitoring Station ID (see figure)  
Date Action Level Check SA-AIR1 SA-AIR2 SA-AIR3 SA-AIR4 Notes
Jul 3 All Below 0.0787 0.7001 0.5701 1.2684 --
Jul 4 All Below 0.0336 0.1621 0.1619 0.1787 --
Jul 6 All Below 0.0311 0.152 0.237 0.1733 --
Jul 7 All Below 0.0099 0.0705 0.0064 0.0193 --
Jul 10 All Below 0.0319 0.5339 0.3132 0.7595 --
Jul 11 All Below 0.0329 0.564 0.1297 0.8149 --
Jul 12 All Below 0.0042 0.1 0.0379 0.0208 --
Jul 13 All Below 0.0012 0.0061 0.1007 0.0731 --
Jul 14 All Below 0.0116 0.0589 0.1861 0.0609 --
Jul 17 All Below 0.0432 0.568 0.4579 1.0982 --
Jul 18 All Below 0.0218 0.0999 0.1817 0.2725 --
Jul 19 All Below 0.0077 0.0188 0.0035 0.0057 --
Jul 20 All Below 0.002 0.0764 0.1053 0.005 --
Jul 21 All Below 0.0017 0 0.1813 0.0238 --
Jul 24 All Below 0.0797 0.8055 0.3473 1.1773 --
Jul 25 All Below 0.055 0.7761 0.066 1.1491 --
Jul 26 All Below 0.0061 0.0981 0.0836 0.1666 --
Jul 27 All Below 0.0157 0.2167 0.1349 0.2275 --
Jul 28 All Below 0.0357 0.7407 0.2269 1.0221 --
Jul 31 All Below 0.055 0.7761 0.066 1.1491 --

NA = Data not collected or recorded
Volatile Organic Compounds (VOCs parts per million)
Return to top

 


2018 Air PCB Data
Corrective Action Level = 0.100 micrograms per cubic meter

View Recent Data

  Monitoring Station ID (see figure)  
Date Action Level Check SA-AIR1 SA-AIR2 SA-AIR3 SA-AIR4 Notes
July 2018 NA NA NA NA NA --

NA = Data not collected or recorded
Total PCBs (micrograms per cubic meter)
Return to top

 

Water Monitoring - 2018 Route 131 Staging Area Construction

Program includes turbidity monitoring using real-time meters for solids and PCB analytical testing at water column and water intake locations. Corrective action levels have been established based on levels that are safe for the community for both turbidity and PCBs. The actual monitoring results will be compared to the corrective action levels to determine if adjustments in construction are needed. The water locations and tabulated results are provided below.

Water Column Monitoring Locations (click to enlarge)

Site Map
 


2018 Water Column Turbidity Data
(Corrective Action Level = 25 NTU above WC-UP Level)

View Recent Data

  Monitoring Station ID (see figure)  
Date Action Level Check WC-UP (0.5x) WC-NF (0.2x) WC-NF (0.8x) WC-MOUTH (0.2x) WC-MOUTH (0.8x) WC-SLR (0.2x) WC-SLR (0.8x) Notes
Jul 2 All Below 0.1 0.2 1.9 1.2 0.7 0.2 0.4 --
Jul 3 All Below 0.1 0.8 1.4 0.8 0.0 0.0 0.4 --
Jul 5 All Below 0.1 0.2 1.2 0.2 1.0 0.6 0.7 --
Jul 6 All Below 0.1 0.5 0.8 0.8 0.1 0.1 0.1 --
Jul 9 All Below 0.3 1.1 1.0 1.9 1.0 0.3 0.0 --
Jul 10 All Below 0.5 0.3 1.1 0.9 0.7 1.4 0.4 --
Jul 11 All Below 0.4 0.0 0.7 1.3 1.7 0.8 0.6 --
Jul 12 All Below 0.5 0.1 0.3 0.4 1.0 0.0 0.0 --
Jul 13 All Below 0.3 0.7 1.2 0.0 0.6 0.1 0.0 --
Jul 16 All Below 0.7 0.4 0.1 0.5 0.2 0.5 0.7 --
Jul 17 All Below 0.3 0.2 0.1 0.1 1.0 0.5 0.5 --
Jul 18 All Below 0.6 0.6 0.3 0.7 1.4 0.2 0.3 --
Jul 24 All Below 0.7 0.4 0.0 0.9 0.1 0.1 0.5 --
Jul 25 All Below 0.2 0.0 0.0 0.8 0.6 0.2 0.4 --
Jul 26 All Below 0.2 0.4 0.3 0.4 0.7 0.7 0.4 --
Jul 27 All Below 0.4 0.1 0.3 0.8 0.1 0.3 0.4 --
Jul 30 All Below 0.5 0.1 0.2 0.0 0.1 0.0 0.0 --
Jul 31 All Below 0.7 0.7 0.1 0.6 0.3 0.1 0.1 --

Turbidity (nephelometric turbidity unit; NTU)
Return to top


2018 Water Column PCB Data
(Corrective Action Level = 0.5 micrograms per liter)

View Recent Data

  Monitoring Station ID (see figure)  
Date Action Level Check WC-NF WC-MOUTH WC-SLR Notes
July 2018 NA NA NA NA --

Total PCBs (micrograms per liter)
Return to top

Water Intake Monitoring Locations (click to enlarge)

Site Map


2018 Water Intake Turbidity Data
(Corrective Action Level = 25 NTU above Baseline Level)

View Recent Data

  Monitoring Station ID (see figure)  
Date Action Level Check IN-AE-RAW IN-SRMT-RAW IN-SRMT-FIL Notes
Jul 2 All Below 1.0 0.7 0.1 --
Jul 3 All Below 0.4 0.9 0.6 --
Jul 5 All Below 2.0 0.8 0.2 --
Jul 6 All Below 0.3 1.2 0.3 --
Jul 9 All Below 1.1 0.6 0.0 --
Jul 10 All Below 0.3 0.9 0.2 --
Jul 11 All Below 0.2 1.0 0.1 --
Jul 12 All Below 1.1 0.9 0.4 --
Jul 13 All Below 0.4 0.6 0.4 --
Jul 16 All Below 0.1 0.5 0.2 --
Jul 17 All Below 0.5 1.0 0.2 --
Jul 18 All Below 0.2 2.8 0.0 --
Jul 24 All Below 0.4 1.4 0.7 --
Jul 25 All Below 0.2 0.5 0.3 --
Jul 26 All Below 0.2 1.2 0.8 --
Jul 27 All Below 0.5 0.7 0.3 --
Jul 30 All Below 1.4 0.9 0.1 --
Jul 31 All Below 0.4 1.1 0.5 --

NA = Data not collected or recorded
Turbidity (nephelometric turbidity unit; NTU)
Return to top


2018 Water Intake PCB Data
(Corrective Action Level = 0.5 micrograms per liter)

View Recent Data

  Monitoring Station ID (see figure)  
Date Action Level Check IN-AE-RAW IN-SRMT-RAW IN-SRMT-FIL Notes
July 2018 NA NA NA NA --

Total PCBs (micrograms per liter)