Environmental monitoring for the 2021 construction includes water and air. Air monitoring is being performed around the secure landfill, Route 131 Staging Area, Haverstock Road Staging Area, and Alcoa East Plant dock during construction at those locations. Water monitoring is being performed in the river and at water intakes. These monitoring activities and results for September are summarized below. (Additional 2021 Lab Results: Current Month | April | May | June | July | August | September )

Air Monitoring - 2021 Secure Landfill Construction and Operation

Program includes particulate monitoring using real-time meters for particulates (or dust) and volatile organic compounds (VOCs) and sampling for PCB analytical testing. Corrective action levels have been established based on levels that are safe for the community for particulates, VOCs, and PCBs. The actual monitoring results are compared to the corrective action levels to determine if adjustments in construction are needed. The air monitoring locations and tabulated results are provided below.

Note that air monitoring for PCBs and VOCs was discontinued in June as material handling and disposal operations were completed. Air monitoring for dust was also discontinued in June as landfill construction and covering efforts were completed. Additional dust monitoring will be performed if final covering activities are performed this year.

Air Monitoring Locations - Secure Landfill


Return to top for lab results from previous months

Air Monitoring - 2021 Route 131 Staging Area

Program includes particulate monitoring using real-time meters for particulates (or dust) and volatile organic compounds (VOCs) and sampling for PCB analytical testing during handling of potential PCB-containing material. Corrective action levels have been established based on levels that are safe for the community for particulates, VOCs, and PCBs. The actual monitoring results are compared to the corrective action levels to determine if adjustments in construction are needed. The air monitoring locations and tabulated results are provided below.

Note that air monitoring for PCBs was discontinued in June as material handling was completed. Air monitoring also transitioned to particulate (dust) only once PCB material handling was completed.

Air Monitoring Locations - Rt 131 Staging Area


2021 Air Particulate Data (Corrective Action Level = 0.150 milligram per cubic meter above upwind location)

  Monitoring Station ID (see figure)  
Date Action Level Check SA-AIR1 SA-AIR2 SA-AIR3 SA-AIR4 Notes
September 1 All Below NA NA 0.0184 NA SA-AIR1, SA-AIR2, SA-AIR4 data not reported due to modem issue
September 2 All Below NA NA 0.0269 NA SA-AIR1, SA-AIR2, SA-AIR4 data not reported due to modem issue
September 3 All Below NA NA 0.014 NA SA-AIR1, SA-AIR2, SA-AIR4 data not reported due to modem issue
September 4 All Below 0.0083 0.0041 0.0097 0.0192 --
September 5 All Below 0.0182 0.0043 0.0219 0.017 --
September 8 All Below 0.0099 0.0096 0.0109 0.0184 --
September 9 All Below 0.0131 0.0155 0.0164 0.0218 --
September 10 All Below 0.0099 0.0119 0.017 0.0149 --
September 11 All Below 0.0036 0.0106 0.0081 0.0205 --
September 12 All Below 0.0077 0.0105 0.0135 0.0225 --
September 14 All Below 0.0043 0.0074 0.0112 0.007 --
September 15 All Below 0.0341 0.0322 0.0345 0.0394 --
September 16 All Below 0.0051 0.0082 0.0188 0.0434 --
September 17 All Below 0.003 0.0077 0.0061 0.0179 --
September 18 All Below 0.015 0.0126 0.0153 0.0161 --
September 19 All Below 0.0108 0.0107 0.0141 0.0153 --
September 21 All Below 0.0051 0.0097 0.0084 0.0103 --
September 22 All Below 0.0057 0.0095 0.0085 0.0106 --
September 23 All Below 0.0108 0.0087 0.012 0.0142 --
September 24 All Below 0.0032 0.0073 0.0056 0.0074 --
September 25 All Below 0.002 0.0081 0.0051 0.0053 --
September 26 All Below 0.0049 0.0107 0.0152 0.0107 --
September 28 All Below 0.0077 0.011 0.0143 0.0167 --
September 29 All Below 0.0075 0.0101 0.0112 0.0111 --
September 30 All Below 0.0036 0.0116 0.0108 0.0214 --


NA = Data not collected in accordance with plan
Particulates (milligrams per cubic meter)
Return to top for lab results from previous months

Air Monitoring - 2021 Dredge Mobile River Stations

Program includes sampling for PCB analytical testing. The corrective action level has been established based on a level that is safe for the community. The actual monitoring results are compared to the corrective action level to determine if adjustments in construction are needed. The air monitoring locations and tabulated results are provided below.

Note that air monitoring for PCBs was performed in April through June concurrent with the river dredge operations. Dredging is complete.

Air Monitoring Locations - Dredge Corridor


Return to top for lab results from previous months

Air Monitoring - 2021 Haverstock Road Support Area

Program includes particulate monitoring using real-time meters for particulates (or dust). The corrective action level has been established based on a level that is safe for the community. The actual monitoring results are compared to the corrective action level to determine if adjustments in construction are needed. The air monitoring locations and tabulated results are provided below.

Air Monitoring Locations - Haverstock Road Area


2021 Air Particulate Data (Corrective Action Level = 0.150 milligram per cubic meter above upwind location)

  Monitoring Station ID (see figure)  
Date Action Level Check HAV-AIR1 HAV-AIR2 HAV-AIR3 Notes
September 1 All Below 0.0242 0.0107 0.047 --
September 2 All Below 0.0198 0.0061 0.047 --
September 3 All Below 0.015 0.002 0.0366 --
September 4 All Below 0.014 0.0041 0.0323 --
September 5 All Below 0.015 0.0057 0.045 --
September 8 All Below 0.0193 0.0102 0.032
September 9 All Below 0.0261 0.015 0.0345
September 10 All Below 0.0211 0.0128 0.0218 --
September 11 All Below 0.016 0.0085 0.0202 --
September 12 All Below 0.008 0.002 0.0191 --
September 14 All Below 0.0172 0.0116 0.0165 --
September 15 All Below 0.0515 0.0046 0.0453 --
September 16 All Below 0.0176 0.0038 0.0156 --
September 17 All Below 0.0158 0.0052 0.0147 --
September 18 All Below 0.0239 0.0147 0.02 --
September 19 All Below 0.015 0.135 0.0175 HAV-AIR2 levels not related to field activities.
September 21 All Below 0.0173 0.0101 0.0206 --
September 22 All Below 0.0179 0.0102 0.0263 --
September 23 All Below 0.0207 0.0094 0.03 --
September 24 All Below 0.0154 0.0044 0.005 --
September 25 All Below 0.0132 0 0.0154 --
September 26 All Below 0.016 0.001 0.0218 --
September 28 All Below 0.014 0.0154 0.0487 --
September 29 All Below 0.0152 0.0054 0.0157 --
September 30 All Below 0.0143 0.005 0.0152 --


NA = Data not collected in accordance with plan
Particulates (milligrams per cubic meter)
Return to top for lab results from previous months

Air Monitoring - 2021 Alcoa East Plant Dock Area

Program includes particulate monitoring using real-time meters for particulates (or dust). The corrective action level has been established based on a level that is safe for the community. The actual monitoring results are compared to the corrective action level to determine if adjustments in construction are needed. The air monitoring locations and tabulated results are provided below. Monitoring is only performed when there is active work at this area.

Air Monitoring Locations - Alcoa East Plant Dock Area


2021 Air Particulate Data (Corrective Action Level = 0.150 milligram per cubic meter above upwind location)

  Monitoring Station ID (see figure)  
Date Action Level Check EP-AIR1 EP-AIR2 EP-AIR3 EP-AIR4 Notes
September 1 All Below 0.037 0.0192 0.0205 0.027 --
September 2 All Below 0.0342 0.0179 0.0137 0.0252 --
September 3 All Below 0.028 0.0114 0.005 0.0188 --
September 4 All Below 0.0252 0.0166 0.005 0.019 --
September 15 All Below 0.0487 0.0428 0.0353 0.0442 --
September 16 All Below 0.0238 0.0096 0.0078 0.0174 --
September 17 All Below 0.025 0.0076 0.0103 0.0089 --
September 18 All Below 0.0292 0.0291 0.021 0.0183 --
September 26 All Below 0.0359 0.0179 0.0826 0.0227 --
September 29 All Below 0.0213 0.0083 0.009 0.0094 --
September 30 All Below 0.0256 0.0108 0.0084 0.0119 --


NA = Data not collected in accordance with plan
Particulates (milligrams per cubic meter)
Return to top for lab results from previous months

Water Monitoring - 2021 River Remediation

Program includes turbidity monitoring using real-time meters for solids and PCB analytical testing at the water intake locations and total suspended solids (TSS) and PCB analytical testing at the river locations. Corrective action levels have been established based on levels that are safe for the community for both solids and PCBs. The actual monitoring results will be compared to the corrective action levels to determine if adjustments in construction are needed. The water locations and tabulated results are provided below.

Monitoring was performed for 50+ days with half of these days including capping only and the other half with capping and dredging. PCBs were not detected in any samples during routine monitoring. Water monitoring for PCBs was discontinued in June based on these results. Monitoring for solids will continue through the end of construction.

Water Column Monitoring Locations


2021 Water Column Total Suspended Solids Data (Corrective Action Level = 100 mg/L above WC-UP Level at WC-SLR)

  Monitoring Station ID (see figure)  
Date Action Level Check WC-UP1 WC-NF2 WC-NF WC-NF3 WC-MOUTH WC-SLR Notes
September 1 All Below Below detectable levels 43 Below detectable levels NA NA Below detectable levels --
September 2 All Below Below detectable levels 34 13 NA NA Below detectable levels --
September 3 All Below Below detectable levels NA 27 NA NA 5.7 --
September 4 All Below 6.1 NA 27 NA NA 11 --
September 7 All Below Below detectable levels Below detectable levels 13 NA 17 6.2 --
September 8 All Below Below detectable levels 7.4 81 NA 11 Below detectable levels --
September 9 All Below Below detectable levels 5.2 73 NA 24 7.2 --
September 10 All Below Below detectable levels 6.8 34 NA 33 7.5 --
September 11 All Below Below detectable levels 72 77 NA 27 Below detectable levels --
September 13 All Below Below detectable levels 6.0 20 NA 22 Below detectable levels --
September 14 All Below Below detectable levels 58 47 NA 18 Below detectable levels --
September 15 All Below Below detectable levels NA 24 NA NA 8.4 --
September 16 All Below Below detectable levels NA 37 NA NA 6.3 --
September 17 All Below Below detectable levels 64 50 NA NA 8.4 --
September 18 All Below Below detectable levels NA 23 NA 28 10 --
September 20 All Below Below detectable levels NA 20 NA 11 Below detectable levels --
September 21 All Below Below detectable levels NA 47 NA 6.8 Below detectable levels --
September 22 All Below Below detectable levels NA 31 NA 9.0 Below detectable levels --
September 23 All Below Below detectable levels NA 45 NA 10 5.5 --
September 24 All Below Below detectable levels NA 48 NA 9.7 Below detectable levels --
September 25 All Below Below detectable levels 11 43 NA NA Below detectable levels --
September 27 All Below Below detectable levels NA 10 NA 9.8 5.1 --
September 28 All Below Below detectable levels NA 25 NA 8.7 5.0 --
September 29 All Below Below detectable levels NA 42 NA 7.5 5.7 --
September 30 All Below Below detectable levels NA 30 NA Below detectable levels Below detectable levels --


Total Suspended Solids (TSS; milligrams per liter)
Return to top for lab results from previous months

Water Intake Monitoring Locations


2021 Water Intake Turbidity Data (Corrective Action Level = 25 NTU above Baseline Level)

  Monitoring Station ID (see figure)  
Date Action Level Check IN-AE-RAW IN-SRMT-RAW IN-SRMT-FIL Notes
September 1 All Below 2.8 1.4 0.0 --
September 2 All Below 1.8 1.8 0.1 --
September 3 All Below 1.5 1.5 0.0 --
September 4 All Below 1.8 1.4 0.0 --
September 7 All Below 3.2 1.5 0.0 --
September 8 All Below 2.4 3.0 0.1 --
September 9 All Below 3.7 1.6 0.0 --
September 10 All Below 2.9 4.1 0.1 --
September 11 All Below 1.1 1.3 0.0 --
September 13 All Below 0.9 1.5 0.0 --
September 14 All Below 1.2 1.5 0.0 --
September 15 All Below 1.6 1.6 0.0 --
September 16 All Below 0.9 1.6 0.1 --
September 17 All Below 2.0 1.6 0.0 --
September 18 All Below 0.8 1.8 0.2 --
September 20 All Below 1.3 1.6 0.0 --
September 21 All Below 0.8 1.5 0.0 --
September 22 All Below 1.1 1.5 0.1 --
September 23 All Below 2.2 1.7 0.1 --
September 24 All Below 0.8 1.5 0.1 --
September 25 All Below 0.9 1.6 0.0 --
September 27 All Below 1.0 1.5 0.0 --
September 28 All Below 1.3 1.5 0.2 --
September 29 All Below 1.0 1.5 0.1 --
September 30 All Below 0.8 1.5 0.0 --


Turbidity (Nephelometric Turbidity Unit)